preparations
preparations
This the hall where I’ll build the tugboat.
With kind regards to:
stichting Sart www.sart.tv and www.domijn.nl
I’m waiting for the delivery of:
the specialy made, 6 meter long Beeboard.
http://pregis.com/
(Hexacomb Core Type 1, XXHXLA (Xtra-Xtra-Heavy Xtra-Low-Absorption)
the water-repelling coating.
http://megapur.net/
(megahydral, hydrofobierungsmittel)
the cardboard U-and L-beams
http://www.cader.nl/
(Angleboard Eco hoekprofiel)
Saturday, March 27, 2010